Mr. Jason

What can I do for you?

Mr. Jason

What can I do for you?

Home> Products> Drilling Rig and Workover Rig> Drilling And Workover Rig Matching Production> ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well
ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well
ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well
ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well
ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well
ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well
ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well
ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well
ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well
ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well

ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well

Get Latest Price
Payment Type:L/C,T/T,Paypal,Money Gram,Western Union
Incoterm:FOB,CFR,CIF
Min. Order:1 Piece/Pieces
Transportation:Ocean,Land,Air
Port:China Sea-port,Railway station,Airport
Product Attributes

Model No.ZJ50/3150

BrandYoulong Energy

UseOil Well

Applicable IndustryManufacturing Plant, Energy &Amp; Mining

Where To Provide Local Services (in Which Countries Are There Overseas Service Outlets)Egypt, Canada, United States, Germany, Viet Nam, Philippines, Brazil, Saudi Arabia, Indonesia, Pakistan, India, Russia, Thailand, Malaysia, Australia, Uae, Kazakhstan, Ukraine, Uzbekistan, Tajikistan

Video Factory InspectionProvided

Mechanical Test ReportProvided

Marketing TypeOrdinary Product

Packaging & Delivery
Selling Units : Piece/Pieces
Package Type : As per customer's requirement
rig with power swivel, hydraulic slips, iron rough
ZJ30 (XJ750hp 3000m) rigs
Product Description

ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well

Drilling Onsite1

Over 4 decades,We have been specializing in drilling rig matching and production,and can provide ZJ90,ZJ70,ZJ50,ZJ40,ZJ30 drilling rig and related accessories that fully conform to API standard,including the drill,top drive,BOP blowout preventer,manifold system,compound drill pipe,drill pipe,drill collar,drilling tools,commuter transport vehicles,the lifting cranes and excavators,generator set etc.

Workover Rig 2Workover Rig 1


ZJ50/3150D rig adopts 3 sets of CAT3512 diesel generator sets as the main power. The 600V/50Hz AC is rectified 0750V DC by SCR cabinet to drive YZ08/YZ08A series DC motor for Drawworks, Rotary Table and mud pumps. Drawworks is driven by 2 sets of motors,2 sets of mud pumps are separately driven by 2 sets of motors. Rotary table is driven by 1 motor, electrical transmission system is one-two control type, AC-SCR-DC transmission. Front open-face mast, swing up substructure, hoisted by Drawworks power, main brake of Drawworks is hydraulic disc brake and the auxiliary brake is magnetic eddy current brake.

 

Characteristics and features

▲Adopt swing up or slingshot substructure. Substructure, mast and all equipments on the floor are installed at low position,mast and substructure are raised up at once by Drawworks power. Have advantages of dismounting convenience, quick-carrying, entire movement and installation, etc.

▲Drill arrangement meet the requirement of explosion-proof, safety, drilling engineering and equipment installation, disassembly and convenient maintenance.

▲The Drawworks, rotary table and Mud Pump can realize independent step less speed regulation, has provided the safeguard for optimizing drilling technology.



Specifications and parameters

Nominal drilling depth(114mmDP)

35005000m

Open diameter of rotary table

φ952.5mm (37.5” )

(127mmDP)

28004500m

Qty.× power of diesel engine

3×1080kW

Max.hook load

3150kN

Shift of Drawworks

Stepless speed regulation

Traveling system

6×7

Height of drilling floor

9m

Dia of Drill line

φ35mm

Mast type and height

K type, 45m

Qty.× power of mud pump

2×1300hp

Drawworks power

1100kW1500hp

Transmission type

AC-SCR-DC

mud high pressure manifold

Φ102mmdia×35MPa

shift of rotary table

2 shifts step less speed regulation

Effective capacity of Mud Tank of solid control system

≥240m3



Group Strength Advantages:

With registered capital RMB 84.76 million, covering 220,000 square meters, 76 workshops, 1058 Staffs, 950 sets of cold and heat machining equipment, 50 sets of numerically controlled equipment, ZYZJ O&G Group has consecutively established the strategic partnership with SINOPEC, CNPC, Zhongyuan Oil Field and Shengli Oil Field, and leveraged its technical and manufacturing advantages to provide satisfactory products and solution services to customers at home and abroad.

All products are manufactured under ISO9001, ISO14001,and comply with the requirements of API spec (acquired in 1999, including API 4F5CT7K8C11AX11B11E

With professional teams experienced in the maintenance of drilling machinery,TDS,SCR equipment, we can undertake Pumping Unit oil well on-site management services.

Long-term supply accessories of Drilling Rigs, workover rigs,mud pump and beam pumping unit, and distribute drill pipe, drill collar, casing, tubing, special drill pipe sub etc.


We are major at Cementing and Fracturing Equipment, Gate Valve and wellhead Christmas Tree,Plunger Pumps and Mud Pumps, Flow line Products, Solid Control Equipment,Drilling Rigs and Work over Rigs Matching Equipment etc.

High quality & Steady quantity & Most competitive price will be sent for you.


Home> Products> Drilling Rig and Workover Rig> Drilling And Workover Rig Matching Production> ZJ50/3150 Drilling Rig for Oil Gas Geothermal Well
  • Send Inquiry

Copyright © 2024 Henan Youlong Petroleum Engineering Technology Co.,Ltd All rights reserved. Privacy Policy

Send Inquiry
*
*

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send